The Malatya Project is a 100% Turkish-owned mining investment that aims to utilize the country’s natural resources efficiently and bring them into the economy through advanced mining technologies, while ensuring gold production is carried out in an environmentally responsible and sustainable manner in compliance with international standards.

Location:

Hekimhan, Malatya

Ore Type:

Gold (Au)

Mining Method:

Open-Pit Mining

Metallurgical Process:

Heap Leaching

Project Stage:

Environmental Impact Assessment (EIA) Process On going

The Malatya Project is an open-pit gold mining project aimed at producing doré gold through the heap leaching method.

The project aims to contribute directly to regional development and the national economy. Drilling activities are ongoing to expand the resource base, while new discoveries are expected to increase the overall resource potential through an option agreement covering adjacent licensed areas.

Strategic Importance

The Malatya Project is a strategic investment aimed at reducing Türkiye’s dependence on imported gold, bringing domestic mineral resources into the economy, and enhancing technological capabilities in the mining sector. By supporting regional development and strengthening local employment, the project aims to contribute to sustainable growth through an environmentally responsible approach to mining.

The Malatya Project aims to produce gold in accordance with the principles of sustainable mining, utilizing modern leaching and recovery technologies designed to ensure the highest standards of environmental protection.

Before entering the production process, the ore is crushed to the appropriate particle size and undergoes a three-stage preparation process. During this stage, lime and water are added to maintain the pH level within the range of 10–11, enabling efficient gold dissolution. The prepared ore is then transported to the heap leach pad and placed in controlled layers. The base and side slopes of the heap leach facility are lined with a compacted clay layer and a double-layer HDPE geomembrane, preventing contact with groundwater and ensuring environmental protection.

The leach solution is applied to the ore through a drip irrigation system. As the solution percolates through the heap, it dissolves the gold and is collected through pipes at the base of the heap before being directed to the solution collection ponds. From there, the solution is transferred to the ADR (Adsorption, Desorption, and Reactivation) Unit for gold recovery. The gold dissolved in the solution is adsorbed onto the surface of activated carbon. Gold-bearing doré bars are then produced through pressurized stripping, electrowinning, and smelting processes.

Nakkaş Madencilik | Saya Mining
Nakkaş Madencilik | Saya Mining

This process reflects the Malatya Project’s commitment to both environmental protection and sustainable mining practices. Modern heap leaching and gold recovery technologies enhance production efficiency while directly contributing to Türkiye’s domestic gold production capacity and regional development.

In line with this approach, we are committed to the principles of regulatory compliance, environmental protection, social responsibility, transparency, and efficiency. As Saya Madencilik, our goal is to take a leading role in sustainable mining by implementing environmental practices recognized as exemplary at both national and international levels across all our facilities, while ensuring the long-term continuity of these practices.